Genoa Township Equalizes SBR Inflow for Lake Edgewood

Check out this project report highlighting Kennedy’s creative problem solving.

Kennedy’s solution solved a long-standing issue at the Lake Edgewood Wastewater Treatment Plant which is already lowering their operation costs.

Click here to download the report